森城建設股份有限公司
4.1/5
★
基於 8 評論
Contact 森城建設股份有限公司
地址 : | 106, Taiwan, Taipei City, Da’an District, Section 1, Fuxing S Rd, 237號4號森城建設股份有限公司樓之一 |
電話 : | 📞 +88879 |
網站 : | http://www.sccoltd.com.tw/ |
分類: |
建築公司
,
|
城市 : | Fuxing S Rd |
C
|
Chou Kyle on Google
★ ★ ★ ★ ★ |
2
|
21 莊建興 on Google
★ ★ ★ ★ ★ |
李
|
李興昀(Winter) on Google
★ ★ ★ ★ ★ 棒極了
Excellent
|
R
|
Roronoa Zoro on Google
★ ★ ★ ★ ★ 好建商
Good builder
|
徐
|
徐德興 on Google
★ ★ ★ ★ ★ 老字號,品質好的,優良建商
Time-honored, good quality, excellent builder
|
c
|
carlos chen on Google
★ ★ ★ ★ ★ 都更地主戶是次等公民嗎?這家建商在交屋時是有分銷售戶及都更地主戶,地主戶什麼都沒有?為何設施設備是如此的不同?
這家建商即便白紙黑字契約書載明電動曬衣架,但實際上用各種理由要都更戶接受改成手動,向公司小姐反應,完全無效。這家建商沒有誠信可言。
Are all landlords a second-class citizen? When this contractor was handing over the house, there were sub-sales households and all landlord households. The landlord households had nothing? Why are the facilities and equipment so different?
Even though the contract of the contract in black and white stated that the electric drying rack was written in black and white, the contractor actually used various reasons to accept the change to manual operation, and responded to the company’s lady, which was completely invalid. This builder has no integrity at all.
|
V
|
Vivien Wang on Google
★ ★ ★ ★ ★ 都更交屋地主戶的心聲:對這家建商是有四個字可以形容蠻橫無禮。承諾地主戶要裝的冷氣、電動曬衣架、免治馬桶等,等到要驗屋的時候,就告知地主以各種理由說明沒有安裝,急於要地主驗屋,在驗屋前也不給地主看屋,給驗屋時間也只有一次及一小時,讓地主只能接受屋況簽收。也因為沒有尾款壓力(都更戶),讓建商在最後驗屋最後一哩路時,硬要地主戶接受。再者,驗屋前要索取相關峻工圖,竟然也無法取得,明明峻工圖是建商本來傳給市府的文件,建商依此圖興建,地主戶本來就可以先取得再依以驗屋。
They are even more to the voice of the landlord: There are four words to describe the rudeness of this builder. Promise the landlord’s household to install air-conditioning, electric drying racks, and toilets, etc. When the house is about to be inspected, inform the landlord that they have not installed them for various reasons, and are eager to ask the landlord to inspect the house, and will not show the landlord before the inspection , The time for house inspection is only once and one hour, so that the landlord can only accept the house condition sign. And because there is no pressure on the final payment (all the households are changed), the builders force the landlord to accept it when the last mile of the home inspection. Furthermore, it is impossible to obtain the relevant completion plans before the inspection. It is clear that the completion plans are documents originally passed to the city government by the builders. The builders build on this plan, and the landlord can obtain them first and then rely on them. Home inspection.
|
W
|
William Tsai on Google
★ ★ ★ ★ ★ 花了5000萬買的新房,地下室連續壁漏水,打了一堆針也不見起色
The new house I bought for 50 million, the basement has a continuous wall leaking
|
Write some of your reviews for the company 森城建設股份有限公司
您的評論將非常有助於其他客戶查找和評估信息
Recommend a place for you