百總工程股份有限公司

3/5 基於 2 評論

Contact 百總工程股份有限公司

地址 :

806, Taiwan, Qianzhen District, Mincyuan 2nd Rd, 6號百總工程股份有限公司

電話 : 📞 +88789
網站 : http://www.pc88.com.tw/
Opening hours :
Wednesday 8:30AM–5:30PM
Thursday 8:30AM–5:30PM
Friday 8:30AM–5:30PM
Saturday Closed
Sunday Closed
Monday 8:30AM–5:30PM
Tuesday 8:30AM–5:30PM
分類:
城市 : nd Rd

806, Taiwan, Qianzhen District, Mincyuan 2nd Rd, 6號百總工程股份有限公司
林昭延 on Google

L
Lewis Lin on Google

貴司於電氣方面會再找另外配合的包商承包工程,剛開始包商來談工程很熱絡,說做過汽電廠、重工業等等電氣工程都打包票沒問題辦到好,竣工圖會給電子檔與書面、案件都很好配合,實際上根本不是如此,廠商素質低落滿嘴抱怨,接個數位輸入輸出也接錯導致PLC片損壞(損壞我司自行吸收)、動力線端子不按照線徑與端子大小去做,把動力線銅線剪掉、將過大的端子台硬塞動力盤二次端子,導致送電短路燒毀整組迴路;到了工程後期,貴司的承包商找了貴司的營業部長官前來我司抗議,認為我司未驗收工程還逼人將工程完工(這不是本來就要完工的嗎?),我司在此會議中提出許多點證據證明貴司包商並未完成承包案件工程,但最後認賠還是給了你們,不然我實在是不想驗收貴司的案件。順道一提,我司曾在十年前吃過一次這樣的悶虧(另個單位的儀電類工程案件),真不知道為何十年後還要再找你們,然後再吃一次一樣的悶虧。到底為什麼呢?或許你們比我更清楚。建議承包商工程能力提升,做工程不是靠討錢在做的,是靠實力在做的。
Your company will find another cooperative contractor in the electrical field to contract the project. At the beginning, the contractor came to talk about the project very warmly. It said that the electrical engineering such as the steam power plant, heavy industry, etc. were packed without any problem. The completion plan will give The electronic file cooperates well with the written and case. In fact, this is not the case at all. The manufacturer is complaining about its low quality. The digital input and output are also connected incorrectly, resulting in damage to the PLC chip (damaging our own absorption), and the power line terminals do not follow the wire diameter. According to the size of the terminal, cut off the copper wire of the power line, and plug the excessively large terminal block with the secondary terminals of the power disk, which caused the power transmission short circuit to burn out the entire set of circuits; at the later stage of the project, your contractor sought the sales minister of your company. Come to our company to protest and think that our company's unaccepted project is also compelling to complete the project (isn't it supposed to be completed?) At this meeting, our company put forward a lot of evidence to prove that your contractor has not completed the project in the contract case , But in the end the pledge was given to you, otherwise I really do not want to accept your case. By the way, our company once had such a boring loss ten years ago (in the case of electrical and electronic engineering in another unit), I really do n’t know why I will find you again after ten years, and then eat the same boring again deficit. Why on earth? Maybe you know better than me. It is suggested that the contractor's engineering capacity should be improved. The engineering is not done by asking for money, but by strength.

Write some of your reviews for the company 百總工程股份有限公司

您的評論將非常有助於其他客戶查找和評估信息

評分 *
你的意見 *

(Minimum 30 characters)

你的名字 *