芳鼎空間規劃 - No. 97-8號廣興 Pingtung City

4.3/5 基於 6 評論

Contact 芳鼎空間規劃

地址 :

No. 97-8號廣興 Pingtung City, Pingtung County, Taiwan 900

電話 : 📞 +88997
網站 : https://www.facebook.com/fundingdesign/
分類:
城市 : Pingtung County

No. 97-8號廣興 Pingtung City, Pingtung County, Taiwan 900
蕭敏均 on Google

吳豐任 on Google

H
Han-Yun Hsiao on Google

Y
Yu-Chen Hsiao on Google

王文賢 on Google

莊閤軒 on Google

1. 說了要裝早上看不到內部的玻璃,也沒拿樣本來看,裝之前也沒給業主確認結果裝全部裝了清玻璃。 2.雖然沒有全打掉但是管線牽的跟蜘蛛網ㄧ樣,導致後面又要把天花板釘起來,原本不高的天花板又變的更低。這在做之前業主跟本不知道會變成這樣,做完後也只能認賠。這可能是要住3、50年的房子內…. 3.業主也沒有要求雙切開關,只是一個區域對應該有的開關,莫名奇妙設了兩個雙切;反應說怪怪的結果就這樣拖過交屋也沒有要改的意思。 4.ㄧ樓到二樓樓梯莫名奇妙的焊接在一樓中間的位置,還擅自做了一危險的ㄇ字,也沒跟業主說要做成這樣就裝上去了,後來改成直的磁磚也留下接縫 5.做一個很貴的但又很少用到的上水塔的梯子,然後因爲太長要找地方放也不能退掉 6.一樓馬達明明就說要做個蓋子防雨水,後來問爲什麼不做結果在說別的馬達,就這樣拖過交屋 7.有看過餐廳的廚房內沒一個開關的嗎?就在這裡連燈的開關都不在廚房內哦 8.明明是四月底交屋,結果過期三天(施工期總共七個月不含裝潢),就把很久之前完成的工拿來抵消變成不用罰違約金,而且是交屋驗收當天才說的。簽約的時候還信心滿滿的說會提早完工 9.看完回覆更加生氣,就是用官腔回答帶過自己的低級失誤,想要我再加更奇葩的設計 1.明明知道房間要做推拉門結果把插座設計在門旁邊 很明顯會卡到;如果做了推門,她還做了個插座在門後哦,一次浪費兩個插座還真不容易 2.下面姓蕭(包括英文H開頭)都是自己人,是在刷分數嗎? 3.她回覆廚房裡有開關,我找了四個人來看都沒看到,不知道她第幾隻眼看到的 4.我明明還沒鋪地磚的時候帶她過去說要做馬達罩的,還在那邊狡辯,妳還會相信她? 5.今天來裝燈,師傅說那個線留的太短根本沒什麼用,他也搖頭線和開關亂到不行,一點都不人性化。 6.鐵捲門剛裝完交屋沒幾天就下雨,結果剛打開門就下起瀑布,請芳鼎來維修速度是很快啦,但是維修完跟沒維修時的問題一模一樣,關起來不會密合,甚至還差了四五公分。我也不懂是我們特別衰還是怎麼樣。 7.浴室的置物架和面紙盒根本亂裝,也沒問我們要裝哪就裝了,暈倒 8.想知道有多爛可以私訊參觀 還有其他的就不提了,辛苦工作存的錢就這樣撒下去,後悔莫及
1. It was said that the glass inside could not be seen in the morning, nor did I take a sample to look at it, nor did I confirm the result to the owner before the installation, and all the clear glass was installed. 2. Although it is not completely destroyed, the pipeline is pulled like a spider web, so the ceiling has to be nailed up at the back, and the ceiling that was not high has become lower. Before this was done, the owner did not know that it would become like this, and after it was done, they could only accept compensation. This may be in a house that will live in 3, 50 years.... 3. The owner did not ask for a double-cut switch, but inexplicably set up two double-cut switches in one area for the switch that should be there; the response said that the result was a strange one, and there was no intention to change it. 4. The stairs from the ㄧ floor to the second floor were inexplicably welded in the middle of the first floor. They even made a dangerous ㄇ character without telling the owner to do it like this. Later, they were changed to straight tiles. also leave seams 5. Make a very expensive but rarely used ladder for the water tower, and because it is too long, you have to find a place to put it and can't return it 6. The motor on the first floor clearly said that it needs to have a cover to prevent rain, and later asked why it was not done. The result was that it said other motors, so it was dragged through the house. 7. Have you ever seen that there is no switch in the kitchen of the restaurant? Even the light switch isn't in the kitchen right here. 8. Obviously, the house was handed over at the end of April, and the result was three days overdue (the construction period is seven months in total, excluding decoration), so the work completed a long time ago was used to offset the penalty for liquidated damages, and it was only said on the day of handover and acceptance. . When I signed the contract, I was confident that it would be completed early. 9. I'm even more angry after reading the reply. I just answered my own low-level mistakes in an official tone. I want me to add a more bizarre design. 1. She clearly knew that the room was going to have a sliding door, but she designed the socket next to the door, which would obviously get stuck; if she made a sliding door, she also made a socket behind the door, it's really not easy to waste two sockets at a time 2. The following surname Xiao (including the beginning of English H) is all my own. Are you trying to score points? 3. She replied that there is a switch in the kitchen. I looked for four people to look at it but they didn't see it. I don't know which eye she saw. 4. I brought her over to say that she was going to make a motor cover when I hadn't laid the floor tiles, but I was still arguing over there. Would you still believe her? 5. I came to install the light today. The master said that the line was too short and it was useless. He also shook his head and the line and switch were messed up, which was not humane at all. 6. It rained a few days after the iron roll door was installed and handed over to the house. As a result, a waterfall fell as soon as the door was opened. It is very fast to ask Fangding to repair it, but the problem is exactly the same as when it was not repaired. It won't fit closely, and it's even four or five centimeters away. I don't know if we are particularly weak or what. 7. The shelves and tissue boxes in the bathroom were installed randomly, and we installed them without asking us where to put them, and fainted. 8. If you want to know how bad it is, you can visit by private message There are other not to mention, the money saved by hard work is scattered like this, and there is no time to regret it.

Write some of your reviews for the company 芳鼎空間規劃

您的評論將非常有助於其他客戶查找和評估信息

評分 *
你的意見 *

(Minimum 30 characters)

你的名字 *