Tainanshiyongkangdongchoushui Station

5/5 基於 2 評論

Contact Tainanshiyongkangdongchoushui Station

地址 :

Yongkang District, Tainan City, Taiwan 710

分類:
城市 : Tainan City

Yongkang District, Tainan City, Taiwan 710
D
Derek Chung on Google

毛毛 on Google

因應極端氣候變遷,現有永康抽水站設備老舊,服役已有19年之螺旋式抽水機,已無法滿足永康大排之流量改變。在急降雨下恐抽水不及,導致排水路上游沿線積淹水。水利局於近年大力推動永康區總合治水,已向中央爭取工程補助款,於既有站址進行總容量40CMS抽水站機組更新,以改善集水區之抽水效益。永康大排為永康市北部之主要排水幹線,由於集水區中下游屬於天然低漥地區,豪雨形成之逕流量常無法順利排入永康大排,且永康大排及其支流部份橋樑樑底過低影響排洪,區內洪水無法即時宣洩,以致該區域經常釀成水患。為有效改善積淹水問題,水利局依據水患治理計畫,已將永康大排高速公路以東之部份逕流量經由疏洪道排入鹽水溪,另於今(106)年完成總容量32CMS抽水站協助抽排。目前接續進行永康抽水站機組更新工程,未來更積極爭取更新永康東抽水站並新建鹽洲抽水站,以改善永康大排主支線之排水防護標準。 永康抽水站更新工程施工期限為540日曆天,工程總經費為新台幣3億元整。工程內容包含:新建單機8 cms抽水機組共5組之抽水站工程(地下二層,地上二層) 、進站水路撈污工程、引水閘門工程、油槽工程、5組電動撈污機、儀控及監視系統、抽水井清污系統等。 水利局表示,永康抽水站更新工程預計108年3月全部完工,工程進行係於舊機組旁另建抽水站房,故施工期間並不會影響它原有功能,於汛期間仍可持續運轉,維持應有的防汛任務。市府希望永康抽水站更新完成,除能發揮它原有颱風排洪功能,更能應付全球暖化所帶來的強降雨,有效減輕鹽水溪水位高漲,內水無法排出的風險,提升永康區居住安全並降低市民財產損失。
Due to extreme climate change, the existing Yongkang pumping station is outdated and has been in use for 19 years as a rotary pump. It has been unable to meet the changes in the Yongkang row. There is a fear of pumping during heavy rainfall, which will cause flooding along the upstream of the drainage. In recent years, the Water Resources Bureau has vigorously promoted the total water management in Yongkang District, and has been seeking engineering subsidies from the central government to upgrade the 40CMS pumping station units at the existing sites to improve the pumping efficiency of the catchment area. The Yongkang Grand Drain is the main drainage trunk line in the north of Yongkang City. Because the middle and lower reaches of the catchment area are natural low-lying areas, the runoff formed by heavy rain often cannot be smoothly discharged into the Yongkang Grand Drain. Too low impact on flood discharge, floods in the area cannot be released immediately, which often causes flooding in the area. In order to effectively improve the flooding problem, according to the flood control plan, the Water Conservancy Bureau has discharged part of the runoff to the east of the Yongkang Dapai Expressway into the salt water stream through flood roads, and has completed a total capacity of 32CMS in this year (106). Station assists in drainage. At present, the Yongkang Pumping Station Unit Renewal Project is being continued. In the future, the Yongkang East Pumping Station will be actively renewed and the Yanzhou Pumping Station will be newly built to improve the drainage protection standards of the main branch line of Yongkang. The construction period of the Yongkang Pumping Station Renewal Project is 540 calendar days, and the total project funding is NT $ 300 million. The project includes: a total of 5 sets of new pumping stations with a single 8 cms pumping unit (two underground floors and two above-ground floors), a sewage water intake project at the station, a water gate project, an oil tank project, five sets of electric sewage harvesters, instrument control And monitoring systems, pumping well decontamination systems, etc. The Water Resources Bureau said that the Yongkang Pumping Station Renewal Project is expected to be completed in March 108. The construction of the project will be based on the construction of a separate pumping station next to the old generating unit. Maintain due diligence. The city government hopes that the Yongkang pumping station will be updated. In addition to its original typhoon flood drainage function, it can better cope with the heavy rainfall caused by global warming, effectively reduce the risk of rising saltwater streams and the inability of the internal water to drain, and improve Yongkang District. Safety of residence and reduction of property damage to citizens.

Write some of your reviews for the company Tainanshiyongkangdongchoushui Station

您的評論將非常有助於其他客戶查找和評估信息

評分 *
你的意見 *

(Minimum 30 characters)

你的名字 *

Recommend a place for you